=
Commercial Heat Pump Installations - =

Commercial Heat Pump Installations

Turnkey air source and ground source heat pump installations for commercial buildings. Hex Energy manages feasibility, in-house design, supply, installation and commissioning, with ongoing service and maintenance.

Hex Energy designs around your heating demand, site constraints and day-to-day operations. Improve efficiency, reduce reliance on fossil fuels and assess potential running-cost savings before you invest.

Smaller eligible business properties in England and Wales may receive £7,500 through the Boiler Upgrade Scheme, or £9,000 for qualifying off-gas-grid oil or LPG replacements until March 2027. Scheme rules and system-size limits apply.

FEASIBILITY & SURVEY
IN-HOUSE DESIGN
SUPPLY & INSTALLATION
COMMISSIONING
HANDOVER & SUPPORT
SERVICE & MAINTENANCE

Commercial Ground Source Heat Pumps

Commercial Air Source Heat Pumps

Use the ground beneath your site to provide efficient heating and, where designed for it, cooling for your buildings. Ground source heat pumps can suit schools, healthcare estates, offices and other commercial developments where ground conditions and available space support the design.

Hex Energy assesses feasibility, heating and cooling loads and ground conditions before developing a borehole or ground-array solution. Our in-house geo-exchange design expertise covers vertical and horizontal closed-loop systems and suitable open-loop schemes.

We manage groundworks, heat pump and plant-room installation, controls integration, commissioning and handover, with ongoing servicing and maintenance to support long-term performance.

Commercial air source heat pumps provide low-carbon heating without a buried ground loop. They can suit new builds and retrofit projects where external plant space is available, with installation planned around access, noise requirements and the needs of building users.

Hex Energy’s in-house team assesses building heat losses, hot-water demand, electrical capacity and the existing heating system. We select and design equipment, emitters and controls to suit the property and its operating hours.

Our turnkey service covers feasibility and design through supply, installation, commissioning and handover. We also provide ongoing service and maintenance, helping your system operate efficiently and reliably throughout its working life.

Frequently Asked Questions

How much does a commercial heat pump installation cost?

Commercial heat pump installations are priced around the building and project scope. Costs depend on heating and hot-water demand, system capacity, groundworks or drilling, plant space, electrical upgrades and changes to distribution pipework, emitters and controls.

Hex Energy starts with feasibility and design to establish a practical solution and a clear scope of work. We then provide a tailored proposal covering equipment, installation, commissioning and the support you need after handover.

Share your site details, existing heating system, drawings and intended programme with our team to discuss the next steps. Any grant support is assessed separately against the relevant scheme rules.

The right solution depends on your building’s heat demand, operating hours, available land, geology, electrical supply and existing heating infrastructure. We compare the options during feasibility rather than assuming one technology suits every site.

Ground source can use horizontal ground arrays, vertical boreholes or suitable open-loop arrangements. Required space, borehole depth and spacing must be designed for the site.

Air source avoids ground-loop excavation but still needs appropriate plant space, airflow, acoustic assessment and maintenance access. We also assess heat emitters, controls, hot-water demand and any need for resilience or phased installation.

Hex Energy provides one specialist partner for the full commercial heat pump project:

  1. Feasibility and survey: review the building, energy demand, site conditions and project objectives.
  2. In-house design: develop the heat pump, ground array where required, plant-room layout, hydraulics and controls.
  3. Supply and installation: coordinate equipment, groundworks or drilling and mechanical installation.
  4. Commissioning: test the system and set up controls to the design requirements.
  5. Handover: explain operation and provide the information your facilities team needs.
  6. Service and maintenance: support long-term reliability and performance.

We agree the scope and programme around your site, with phasing and resilience considered where operational continuity is critical.

Boiler Upgrade Scheme (England and Wales): eligible owners of smaller non-domestic properties can receive £7,500 towards an air-to-water or ground source heat pump. This rises to £9,000 until 31 March 2027 for qualifying properties replacing oil or LPG heating with no mains gas connection.

The scheme has capacity limits, including 45kWth for individual systems, with separate rules for combined heat pumps and shared ground loops. MCS installation and all property and system requirements apply. Most new builds and replacements of existing heat pumps are excluded. Larger commercial projects need a separate funding assessment.

Check the current Boiler Upgrade Scheme guidance.

Public-sector projects: the Public Sector Decarbonisation Scheme supports eligible public bodies with heat decarbonisation. However, Phase 4 closed to new applications in November 2024; it should not be treated as an open grant offer. Check current public-sector funding information.

We can discuss technical suitability and scheme requirements during feasibility. Funding is subject to eligibility and approval, so it should be confirmed before being included in your project budget.

Potential savings depend on your current fuel, electricity tariff, operating hours, building heat demand and the seasonal efficiency of the installed system. Higher heat pump efficiency does not automatically mean lower energy bills.

Hex Energy assesses the design and expected performance so you can compare projected energy use and running costs with your existing heating. Appropriate flow temperatures, heat emitters, controls and commissioning all influence the result.

For an investment decision, consider installation costs, any confirmed funding and ongoing maintenance alongside energy savings. We can discuss the assumptions behind the comparison; a fixed saving or payback period cannot be promised for every site.

Discuss Your Commercial Project